
Add to Cart
Hot Gi Pipe 1 1/2 Diameter 1.5inch Galvanized Steel Pipe Fencing Tube
Product Description:
Welded steel pipe in the form of welds are divided into straight seam welded pipe and spiral welded pipe. By production method classification: process classification - arc welded pipe, resistance welded pipe, (high frequency, low frequency) gas welded pipe.
1. Technology
Product Name | Galvanized Steel Pipe |
Standard | API5L , ASTM A106 Gr.B, ASTM A53 Gr.B, ASTM A179/A192,ASTM A513-2007,ASTM A671-2006,ASTM A672-2006 ,BS EN10217, BS EN10296,BS EN 39 ,BS 6323 ,DIN EN 10217-1-2005 |
Steel Grade | Q195/Q215/Q235/Q345/S235JR/GR.B-D/STK500 |
Surface Treatment | Galvanized |
Tolerance | ±2% |
Application: | building industry machinery/Construction of greenhouses..... |
Length | 3-12m |
Processing Service | Bending, Welding, Decoiling, Cutting, Punching |
Thickness | 0.5-2.0mm |
Zinc coating | 40-275g/m2 |
Surface treatment | Oiled 4, Painting black |
Packing | 1, Big OD: in bulk 2, Small OD: packed by steel strips 3, Plastic bags 4, According to customer’s requirements |
Delivery | Normally 10-15 days after get deposits or according to quantity |
galvanized welded carbon steel tube/pipe
carbon steel tube/pipe :
Material: Q195 Mild Steel
Technology: Cold rolled / Hot rolled (High Frequency Welded)
Widely used for furniture, structure pipes
Surface treatment: Black painted or other colors, Galvanized, Annealed, Oiled , Bright
Payment term: T/T, L/C
Picture
FAQ:
Q: Do you provide samples ? is it free or extra ?
A: The sample could can provide for customer with free,but the freight will be covered by customer account.
Q: How can I get your quotation as soon as possible?
A: The email and fax will be checked within 24 hours,meanwhile,the Skype,Wechat and WhatsApp will be online in 24 hours.Please send us your requirement and order information,specification(Steel grade,size,quantity,destination port),we will work out a best price soon.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment or paid against copy of B/L within 5 working days.100% Irrevocable L/C at sight is favorable payment term as well.
Q: Do you accept the third party inspection?
A: Yes absolutely we accept.